Liquid filled transformers

Updated 2026-10-27

Data records

  • Chapter 11 of NFPA 70B-2026 covers the maintenance of power and distribution transformers; its periodic maintenance procedures are visual inspection, cleaning, mechanical servicing and electrical testing, with the lubrication and special subdivisions reserved. Source: NFPA 70B-2026, clause Chapter 11. Verified 2026-10-27. Record equip.liquid-filled-transformers.nfpa70b.chapter
  • Table 11.3.5 of NFPA 70B-2026 lists the transformer electrical tests, among them core insulation resistance, excitation current, insulation power factor and its tip-up, bushing power factor, turns ratio, winding resistance, bolted connection resistance, sweep frequency response analysis and a set of insulating-fluid tests that includes dissolved gas analysis and furan analysis. Source: NFPA 70B-2026, clause Table 11.3.5. Verified 2026-10-27. Record equip.liquid-filled-transformers.nfpa70b.electrical-tests

Sources

  • NFPA 70B-2026, Standard for Electrical Equipment Maintenance, 2026 edition, NFPA. Cited: clause Chapter 11; clause Table 11.3.5. Held as: Purchased single-user copy.

Obtaining the documents

Changelog (2 entries)
DateRevisionChange
2026-10-27created (equip.liquid-filled-transformers.nfpa70b.chapter)
2026-10-27created (equip.liquid-filled-transformers.nfpa70b.electrical-tests)